New Projects

When you create a new project, you will something similar to the screen on the right. The maps are blank, and some default values are populated. The project name will be displayed on the lower-left corner.

In order to create a new set of maps, you will need to, at a minimum:

  1. Generate the height map.
  2. Drop dirt.

Erosion can be done before or after dropping dirt.

If you will be generating rivers, do those before adding biomes because dirt will need to be re-dropped afterward, destroying any biome changes you made.

About Projects Height Map Erosion Drop Dirt Rivers Biomes Region Ores Actions